This page is dedicated my grandfather Dipl. Ing. Wilhelm Finger, a pioneer in exploring new ways to produce clean and renewable hydropower. Among other projects he planned together with Wilhelm Steinböck the Reisseck hydro power complex with a maximum altitude difference between storage and turbine of about 1772m/5815 ft (world record in 1950).